china best BN Apply to komatsu PC1250 SPROCKET HUB of Excavator FINAL DRIVE ASSY Gearbox spare parts manufacturers

Merchandise Description

BN Apply to CZPT PC1250 SPROCKET HUB of Excavator Last Drive ASSY Gearbox spare elements

 

DESCRIPTION:

 

PART NAME

SPROCKET HUB of Excavator Closing Push ASSY Gearbox spare elements

Tools

BN Use to CZPT PC1250

PART No.

SERIAL No.

—-

STOCK CODE

5 90

FRAME HOLES

SPROCKET HOLES

38/32

Class

Construction Machinery Parts, Excavator Spare Parts

Installation

T.TRANSMISSION

Application

Replacement

ITEM CONDITION

NEW

Symbol

BN

 

DESCRIPTION:    

one. ready to mounted in your CZPT PC1250  CZPT s. 

three. All factors are created by us.

four. All new, undamaged.

five. Painted or Unpainted, depend on prerequisite

6. 90 times guarantee, phone or electronic mail with any queries.

7. Plywood Scenario Packing, totally free of fumigation

eight. Supply to CZPT by Sea, Air, or CZPT .

WHY US:

  1. We are the manufacturer and own 18000 mtwo factory places, very good relationship with substance suppliers, which make a lot more competitive cost and regular high quality.
  2. We have much more than eighty models advanced facilities for manufacturing.
  3. We have 8 senior engineers with far more than thirty many years encounter on designing and machining.
  4. Our sales term offer you the effective support for every single CZPT ers.
  5. We are the prolonged expression components supplier for several CZPT firms, this kind of as FOSTER WHEELER CZPT CZPT CO.,LTD and C.R.Dinly and so forth.
  6. We develop spare parts for aged and new CZPT  models, and submit CZPT latest goods to CZPT ers every single month so that to meet up with the marketplace demand.
  7. We have substantial marketplace share in Oversea industry and Domestic marketplace, CZPT Asia 60%, Russia ten%, Center CZPT 8%, North and South CZPT ica 10%,Europe 8%, other individuals 4%.

TRADE Terms:
 

TRADE Phrases

EXW, FOB, CFR, CIF

PAYMENT Phrases

T/T, CZPT ern CZPT , Alipay, Paypal

PORT

HangZhou Port, negotiation

Guide TIME

  1. Stock in hand: 4-7 times for processing and packing
  2. Bulk Manufacturing: 10-35 times, count on the amount.

Shipping

By Sea, Air, CZPT

Get Flow

  1. Customers supply the component quantity, portion identify, design, amount, data of things, delivery phrase.
  2. We quote the very best price according to the prerequisite of CZPT ers.
  3. Validate the buy purchase and pay the deposit.
  4. We prepare and pack the merchandise.
  5. Buyers make the payment in accordance to the Proforma Invoice as soon as the items get all set for supply.
  6. We shipping and delivery the goods with the packing list, industrial bill, B/L and other files requested.
  7. Observe the transportation and arrival about the items. 
  8. Welcome to give us suggestion and opinions once arrival.

Guarantee:

one. Warranty Type: We will exchange the merchandise which have quality issue.
two. Warranty Period of time:
Supply 3 months warranty for the merchandise from the date of arrival. CZPT er ought to check the items according to the buy record following arrival. Make contact with with us and offer the info, photos of the problem items.
3. You need to have to pay for the replacement charge for pursuing issue:
* Wrong Order from CZPT er.
* Natural Disasters cause the hurt.
* Error set up.
* The equipment and reducer operate in excess of time and above load.
* Lost by any problem.
* Xihu (West CZPT ) Dis.n aspect destroyed.
* Corrode with rust in the course of stock and managing.
* Warranty Expired.
4. CZPT s
They are the solution effortless to be rust away, you should wrap them effectively. We just source warranty for the goods we are making, other than the CZPT , Seal, and some other individuals we mention ahead of get.If there is any issue about the items, set up or servicing, you should contact with us any time. We reserve the rights of last interpretation.

 

china  very best BN Apply to komatsu PC1250 SPROCKET HUB of Excavator Closing Drive ASSY Gearbox spare parts makers